RAMP TO I-66 over POTOMAC PKWY & 27TH
WHITEHURST AT ROCK CREEK · County 001, District of Columbia · Built 1998 · 1 Lanes · 52,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.902333, -77.058
This bridge is in worse condition than 34.5% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 28 years old.
Nearby Bridges
K Street Ramp over K Street exit Ramp
Built 1949
K STREET N.W. over ROCK CREEK
Built 1940
K Street Ramp over K Street Entrance Ramp
Built 1949
RAMPS TO&FROM over ROCK CREEK
Built 1940
THOMPSON BOAT CENT over ROCK CREEK
Built 1960
29TH STREET N.W. over C&O CANAL
Built 1900
ROCK CREEK PARKWAY over ROCK CREEK
Built 1983
RAMP 1 WHITEHURST over I-66 TO W.H. FRWY.
Built 1964
K STREET over WHITEHURST FRWY RAMPS
Built 1965
30TH STREET N.W. over C&O CANAL
Built 1900
Bridge Details
- Structure #
- 1301
- Year Built
- 1998
- Length
- 259.7 m (852 ft)
- Max Span
- 32.5 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 52,000
- Material
- Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,500,000
- Total Project Cost
- $3,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.