SOUTHWEST FREEWAY over 2ND ST TO HALF ST SW

SOUTHWEST FRWY &2ND S · County 001, District of Columbia · Built 1963 · 2 Lanes · 22,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1103(RAMP C)
Year Built
1963
Reconstructed
1991
Length
85.6 m (280.8 ft)
Max Span
21.3 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
22,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.