I-295 Ramp C over Malcolm X Avenue
I-295 · County 001, District of Columbia · Built 2021 · 1 Lanes · 750 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
This bridge is in worse condition than 2.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 5 years old.
Bridge Details
- Structure #
- 1033
- Year Built
- 2021
- Length
- 38.4 m (126 ft)
- Max Span
- 36.8 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 1
- Daily Traffic
- 750
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.