WB I-295 Exit Ramp over Suitland Patkway

Suitland Parkway · County 001, District of Columbia · Built 2020 · 2 Lanes · 10,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

This bridge is in worse condition than 5.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 6 years old.

Bridge Details

Structure #
1009-1
Year Built
2020
Length
65.5 m (214.9 ft)
Max Span
37.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
10,700
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.