WB I-295 Exit Ramp over Suitland Patkway
Suitland Parkway · County 001, District of Columbia · Built 2020 · 2 Lanes · 10,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
This bridge is in worse condition than 5.7% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- 1009-1
- Year Built
- 2020
- Length
- 65.5 m (214.9 ft)
- Max Span
- 37.5 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 10,700
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.