ANACOSTIA FREEWAY over Nicholson Street

Anacostia Freeway S.E. · County 001, District of Columbia · Built 1963 · 5 Lanes · 124,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1001
Year Built
1963
Reconstructed
2019
Length
17.1 m (56.1 ft)
Max Span
15.8 m
Width
34.6 m (113.5 ft)
Lanes
5
Daily Traffic
124,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,500,000
Total Project Cost
$2,750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.