EAST CAPITOL ST over ANACOSTIA RIVER & PA

ANACOSTIA RIVER AT E CAP · County 001, District of Columbia · Built 1955 · 6 Lanes · 42,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0233
Year Built
1955
Reconstructed
2020
Length
548 m (1797.9 ft)
Max Span
36.6 m
Width
28.5 m (93.5 ft)
Lanes
6
Daily Traffic
42,100
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000,000
Total Project Cost
$15,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.