T STREET over NORTH CAPITOL ST

T ST. OVER N CAPITOL ST. · County 001, District of Columbia · Built 1963 · 2 Lanes · 3,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0049
Year Built
1963
Reconstructed
2002
Length
19.5 m (64 ft)
Max Span
18.3 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
3,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$1,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.