PUNCHEON RUN CONN over S. STATE ST
SOUTH DOVER · County 001, Delaware · Built 2000 · 4 Lanes · 12,816 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
39.138789, -75.52265
This bridge is in worse condition than 28.1% of bridges in County 001. The average bridge in Delaware is 0 years old; this one is 26 years old.
Nearby Bridges
STATE ST over PUNCHEON RUN
Built 1957
US13/DUPONT HWGY over PUNCHEON RUN
Built 1951
S. GOVERNORS AVE over PUNCHEON RUN
Built 2009
PUNCHEON RUN CONNE over ST JONES RIVER
Built 2000
PUNCHEON RUN over ST. JONES RIVER
Built 2000
DUPONT HWY/US13 over ST. JONES RIVER
Built 1951
POW MIA PARKWAY over N/S RR & PUNCHEON RUN
Built 2017
POW MIA PARKWAY over N/S RR & PUNCHEON RUN
Built 2017
STATE ST over ISAAC BRANCH-MOORES LAKE
Built 1919
DUPONT HWY/US13 over ISAACS BRANCH
Built 1952
Bridge Details
- Structure #
- 2931 150A
- Year Built
- 2000
- Length
- 40 m (131.2 ft)
- Max Span
- 39.1 m
- Width
- 30.7 m (100.7 ft)
- Lanes
- 4
- Daily Traffic
- 12,816
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $700,000
- Total Project Cost
- $800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.