I 95 SB over SILVERSIDE RD
S. OF ARDEN · County 003, Delaware · Built 1967 · 2 Lanes · 30,439 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.792867, -75.490097
This bridge is in worse condition than 48.1% of bridges in County 003. The average bridge in Delaware is 0 years old; this one is 59 years old.
Nearby Bridges
I 95 NB over SILVERSIDE RD
Built 1967
PARKSIDE BLVD over PERKINS RUN
Built 2020
LINCOLN AVE over TRIB OF HOLLY OAK CREEK
Built 1980
HARVEY RD over I 95
Built 1967
HARVEY ROAD over CSX RAILROAD
Built 1953
PHILA PK/MARKET over STONEY RUN
Built 1989
GOV. PRINTZ BLVD over HOLLYOAK CREEK
Built 1935
I 495 over HOLLYOAK CREEK
Built 1972
I 95 SB over SR 3 MARSH RD
Built 1967
BAYNARD BLVD. over SHELLPOT CREEK
Built 1968
Bridge Details
- Structure #
- 1782 059
- Year Built
- 1967
- Length
- 39.6 m (129.9 ft)
- Max Span
- 18.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 30,439
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $800,000
- Total Project Cost
- $1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.