ST. ANNS CHURCH RD over NORFOLK SOUTHERN
SOUTH OF MIDDLETOWN · County 003, Delaware · Built 2010 · 2 Lanes · 3,407 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.432903, -75.716917
This bridge is in worse condition than 22.3% of bridges in County 003. The average bridge in Delaware is 0 years old; this one is 16 years old.
Nearby Bridges
SILVER LAKE RD. over SILVER LAKE SPILLWY
Built 1931
SILVER LAKE RD. over SILVER LAKE SPILLWAY
Built 1939
NOXONTOWN RD. over NOXONTOWN POND/SPILLWAY
Built 1967
RAMP TO US301NB over SANDY BRANCH
Built 2018
SUMMIT BRIDGE RD over CATTAIL BRANCH
Built 1936
US301 NB over TRIB TO SANDY BRANCH
Built 2018
US301 SB over TRIB TO SANDY BRANCH
Built 2018
US301 NB over SANDY BRANCH
Built 2018
US301 SB over SANDY BRANCH
Built 2018
LEVELS RD / SR299 over US301
Built 2018
Bridge Details
- Structure #
- 1503 447
- Year Built
- 2010
- Length
- 23.8 m (78.1 ft)
- Max Span
- 23.2 m
- Width
- 15.6 m (51.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,407
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $209,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.