Mud Pond Road over Bull Mountain Brook

300-ft N of Long Mtn Rd · County 005, Connecticut · Built 2022 · 2 Lanes · 21 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
07083
Year Built
2022
Length
7.1 m (23.3 ft)
Max Span
7.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
21
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.