SUNRISE ROAD over OLD TANNERY BROOK

200 FT W OF ROUTE 69 · County 009, Connecticut · Built 2010 · 2 Lanes · 525 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
07027
Year Built
2010
Length
6.1 m (20 ft)
Max Span
6.1 m
Width
19.6 m (64.3 ft)
Lanes
2
Daily Traffic
525
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.