RTE 1 over BYRAM RIVER

NEW YORK STATE LINE · County 001, Connecticut · Built 1888 · 2 Lanes · 14,570 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
07024
Year Built
1888
Length
27.4 m (89.9 ft)
Max Span
10 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
14,570
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,351,000
Total Project Cost
$5,313,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.