MARJORIE CIRCLE over JEREMY RIVER

500 SOUTH OF ROUTE 85 · County 013, Connecticut · Built 2017 · 2 Lanes · 525 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
06946
Year Built
2017
Length
8.7 m (28.5 ft)
Max Span
4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
525
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.