NILES ROAD over CEDAR SWAMP BROOK

1.6 miles north of Route. · County 005, Connecticut · Built 1956 · 2 Lanes · 65 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
06915
Year Built
1956
Length
10.1 m (33.1 ft)
Max Span
3.8 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
65
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.