ROUTE 63 over WOOSTER BROOK

0.1 MILE SOUTH OF I-84 · County 009, Connecticut · Built 2018 · 4 Lanes · 15,200 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
06692
Year Built
2018
Length
8.1 m (26.6 ft)
Max Span
8.1 m
Width
20.6 m (67.6 ft)
Lanes
4
Daily Traffic
15,200
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.