ROUTE 3 SOUTHBOUND over INTERSTATE-91 & TR804

ROUTE 3 SB OVER I-91 · County 003, Connecticut · Built 1994 · 2 Lanes · 23,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06290
Year Built
1994
Length
198.1 m (649.9 ft)
Max Span
70.1 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
23,000
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.