INTERSTATE-95 over ROUTE 156

1.0 MI N OF ROUTE 9 · County 011, Connecticut · Built 1992 · 6 Lanes · 59,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
06173
Year Built
1992
Length
37.8 m (124 ft)
Max Span
36 m
Width
39.6 m (129.9 ft)
Lanes
6
Daily Traffic
59,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.