DUCK POND ROAD over BUTTERNUT BROOK
NORTH OF BRUSH HILL ROAD · County 005, Connecticut · Built 1992 · 2 Lanes · 66 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.751339, -73.222925
This bridge is in worse condition than 38.5% of bridges in County 005. The average bridge in Connecticut is 0 years old; this one is 34 years old.
Nearby Bridges
US ROUTE 202 over BUTTERNUT BROOK
Built 1988
HIGH BRIDGE ROAD over BANTAM RIVER
Built 2008
WHITES WOODS RD #1 over BANTAM RIVER
Built 2017
US ROUTE 202 over BANTAM RIVER
Built 2019
ROUTE 209 over BANTAM RIVER
Built 1935
NORTH SHORE ROAD over BUTTERNUT BROOK
Built 2016
TRUMBULL STREET over BANTAM RIVER
Built 1986
ROUTE 118 over BANTAM RIVER
Built 1960
NORTH SHORE ROAD over BANTAM RIVER
Built 1980
ROUTE 63 over BANTAM RIVER
Built 1942
Bridge Details
- Structure #
- 06167
- Year Built
- 1992
- Reconstructed
- 2021
- Length
- 7.6 m (24.9 ft)
- Max Span
- 6.4 m
- Width
- 5.8 m (19 ft)
- Lanes
- 2
- Daily Traffic
- 66
- Material
- Wood or Timber
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.