DUCK POND ROAD over BUTTERNUT BROOK

NORTH OF BRUSH HILL ROAD · County 005, Connecticut · Built 1992 · 2 Lanes · 66 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06167
Year Built
1992
Reconstructed
2021
Length
7.6 m (24.9 ft)
Max Span
6.4 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
66
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.