ROUTE 9 SOUTHBOUND over ROUTE 175 (CEDAR STREET)

ROUTE 9 EXIT NO. 38 · County 003, Connecticut · Built 1991 · 2 Lanes · 22,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06104A
Year Built
1991
Length
41.3 m (135.5 ft)
Max Span
39.6 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
22,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.