SOUTH CENTER ST over INTERSTATE-91

2.6 MI NORTH OF ROUTE 75 · County 003, Connecticut · Built 1992 · 2 Lanes · 3,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
06094
Year Built
1992
Length
88.1 m (289 ft)
Max Span
43 m
Width
17.5 m (57.4 ft)
Lanes
2
Daily Traffic
3,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.