ROUTE 140 over CONNECTICUT RIVER

0.1 MI E OF ROUTE 159 · County 003, Connecticut · Built 1992 · 2 Lanes · 11,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06074
Year Built
1992
Length
346.3 m (1136.2 ft)
Max Span
49.1 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
11,700
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.