ROUTE 15 over US RTE 7 & C-D RDWY 601

US ROUTE 7 EXIT NO. 3 · County 001, Connecticut · Built 1991 · 6 Lanes · 60,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
06069
Year Built
1991
Length
64.5 m (211.6 ft)
Max Span
50 m
Width
37.2 m (122 ft)
Lanes
6
Daily Traffic
60,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.