CATO CORNER ROAD over PINE BROOK

0.8 MI S OF ROUTE 149 · County 011, Connecticut · Built 1990 · 2 Lanes · 468 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
06004
Year Built
1990
Length
6.7 m (22 ft)
Max Span
3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
468
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.