BALDWIN AVE&BEE ST over SPOON SHOP BROOK

AT JCT. BEE & BALDWIN STS · County 009, Connecticut · Built 1950 · 2 Lanes · 2,981 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
05940
Year Built
1950
Reconstructed
1990
Length
13.7 m (44.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
2,981
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.