US ROUTE 5 over SCANTIC RIVER

0.3 MILE NORTH OF RTE 194 · County 003, Connecticut · Built 1941 · 4 Lanes · 19,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
05914
Year Built
1941
Reconstructed
1986
Length
37.5 m (123 ft)
Max Span
12.2 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
19,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.