INTERSTATE-91 NB over LEIBERT ROAD

0.1 MILE SOUTH OF EXIT 33 · County 003, Connecticut · Built 1991 · 5 Lanes · 73,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
05864
Year Built
1991
Length
42 m (137.8 ft)
Max Span
40.2 m
Width
25.6 m (84 ft)
Lanes
5
Daily Traffic
73,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.