SHELDON ROAD over DOANVILLE POND
0.5 MI SOUTH OF ROUTE 138 · County 011, Connecticut · Built 2020 · 2 Lanes · 551 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.567064, -71.878361
This bridge is in worse condition than 15.2% of bridges in County 011. The average bridge in Connecticut is 0 years old; this one is 6 years old.
Nearby Bridges
ROUTE 138 over PACHAUG RIVER
Built 1953
ROUTE 165 over GLASGO POND
Built 1934
ROUTE 201 over PACHAUG RIVER
Built 1989
ROUTE 138 over DENISON BROOK
Built 1934
ROUTE 165 over PACHAUG POND
Built 2014
ROUTE 49 over PACHAUG RIVER
Built 1934
BITGOOD ROAD over HOPEVILLE POND
Built 2014
ROUTE 138 over PACHAUG RIVER
Built 1953
FORGE HILL ROAD over PACHAUG RIVER
Built 1920
BITGOOD ROAD over PACHAUG RIVER
Built 2011
Bridge Details
- Structure #
- 05851
- Year Built
- 2020
- Length
- 12.5 m (41 ft)
- Max Span
- 11.6 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 551
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $2,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.