ROUTE 9 RAMP over ROUTE 9

EXIT 26 OFF ROUTE 9 NB · County 003, Connecticut · Built 1988 · 1 Lanes · 4,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
05847
Year Built
1988
Length
129.7 m (425.5 ft)
Max Span
46.6 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
4,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.