ROUTE 9 RAMP over ROUTE 9
EXIT 26 OFF ROUTE 9 NB · County 003, Connecticut · Built 1988 · 1 Lanes · 4,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
41.663881, -72.77385
This bridge is in worse condition than 36.4% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 38 years old.
Nearby Bridges
WHITING STREET over ROUTE 9 & ROUTE 9 RAMP
Built 1976
CHESTNUT STREET over ROUTE 9 SOUTHBOUND
Built 1975
CHESTNUT STREET over ROUTE 9 NORTHBOUND
Built 1975
ROUTE 71 over HERALD SQ COLUMUS BL RR
Built 1971
ROUTE 72 WESTBOUND over RTE 9SB & RTE 9-RAMP 055
Built 1978
ROUTE 72 TR 801 over ROUTE 72 NORTHBOUND
Built 1978
ELLIS STREET over ROUTE 9 & RTE 9 RAMPS
Built 1975
ELLIS STREET over PAN AM RAILROAD
Built 1989
ROUTE 71 over ROUTE 72 & RAMPS
Built 1971
ROUTE 174 over ROUTE 9 TR 813
Built 1978
Bridge Details
- Structure #
- 05847
- Year Built
- 1988
- Length
- 129.7 m (425.5 ft)
- Max Span
- 46.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 4,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.