CENTER ROAD over ASPETUCK RESERVOIR

0.1 MI E OF ROUTE 58 · County 001, Connecticut · Built 1958 · 2 Lanes · 2,923 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05816
Year Built
1958
Reconstructed
1989
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
2,923
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.