PLEASANT POINT RD over AMTRAK RAILROAD

.8 MI S. OF ROUTE 146 · County 009, Connecticut · Built 1988 · 2 Lanes · 135 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
05749
Year Built
1988
Length
10.5 m (34.4 ft)
Max Span
9.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
135
Material
Prestressed Concrete
Design
Slab
Owner
Unknown
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.