SO MAIN STREET #1 over FAWN BROOK

.75 MI. S OF RT 2WB EX15 · County 003, Connecticut · Built 2020 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
05650
Year Built
2020
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
600
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,295,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.