SO MAIN STREET #1 over FAWN BROOK
.75 MI. S OF RT 2WB EX15 · County 003, Connecticut · Built 2020 · 2 Lanes · 600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.604675, -72.418653
This bridge is in worse condition than 19% of bridges in County 003. The average bridge in Connecticut is 0 years old; this one is 6 years old.
Nearby Bridges
ROUTE 2 EASTBOUND over BLACKLEDGE RIVER
Built 1968
ROUTE 2 WESTBOUND over BLACKLEDGE RIVER
Built 1959
SOUTH MAIN STREET over BLACKLEDGE RIVER
Built 1920
SO MAIN STREET #1 over ROUTE 2
Built 1966
ROUTE 2 WESTBOUND over LYMANS BROOK
Built 1964
RIVER ROAD over BLACKLEDGE RIVER
Built 1975
ROUTE 2 WESTBOUND over ROUTE 149
Built 1959
ROUTE 2 EASTBOUND over ROUTE 149
Built 1968
ROUTE 149 over JEREMY RIVER
Built 1999
PAPER MILL ROAD over JEREMY RIVER
Built 1987
Bridge Details
- Structure #
- 05650
- Year Built
- 2020
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $2,295,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.