ROUTE 162 over INDIAN RIVER

2.4 MI E OF US ROUTE 1 · County 009, Connecticut · Built 1988 · 2 Lanes · 13,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
05645
Year Built
1988
Length
19.5 m (64 ft)
Max Span
18 m
Width
15.9 m (52.2 ft)
Lanes
2
Daily Traffic
13,200
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.