EASTERN BOULEVARD over SALMON BROOK

APPROX 370NORTH OF RT 94 · County 003, Connecticut · Built 2018 · 2 Lanes · 6,492 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
05608
Year Built
2018
Length
14.5 m (47.6 ft)
Max Span
14 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
6,492
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$2,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.