ROUTE 3 over ROUTE 2 & RAMP 080 EB

0.24 MI N OF MAIN ST OP · County 003, Connecticut · Built 1987 · 2 Lanes · 26,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
05561
Year Built
1987
Length
84.7 m (277.9 ft)
Max Span
41.8 m
Width
20 m (65.6 ft)
Lanes
2
Daily Traffic
26,800
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.