ROUTE 82 over SWAMP BROOK

0.8 MI W OF ROUTE 11 · County 011, Connecticut · Built 2021 · 2 Lanes · 3,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
05401
Year Built
2021
Length
11.6 m (38.1 ft)
Max Span
10.2 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
3,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,900,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.