ROUTE 8 SOUTHBOUND over SR 711 (HUNTINGTON TPKE)

0.6 MI SOUTH OF ROUTE 108 · County 001, Connecticut · Built 1982 · 2 Lanes · 34,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05271
Year Built
1982
Length
36.2 m (118.8 ft)
Max Span
34.7 m
Width
17 m (55.8 ft)
Lanes
2
Daily Traffic
34,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.