ROUTE 30 over I-84 & I-84 RAMP 247

0.26 MI SOUTH OF ROUTE 83 · County 003, Connecticut · Built 1981 · 4 Lanes · 22,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
05226
Year Built
1981
Length
133.5 m (438 ft)
Max Span
65.5 m
Width
20.9 m (68.6 ft)
Lanes
4
Daily Traffic
22,200
Material
Steel Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.