TUNNEL ROAD over SHEPAUG RIVER

100 FT S OF CHURCH HILL R · County 005, Connecticut · Built 1956 · 2 Lanes · 263 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
05158
Year Built
1956
Reconstructed
2024
Length
37.5 m (123 ft)
Max Span
36.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
263
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$3,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.