BEAR MOUNTAIN ROAD over BALL POND BROOK
300 S OF WOOD CREEK RD · County 001, Connecticut · Built 1956 · 2 Lanes · 948 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.465025, -73.465072
This bridge is in worse condition than 31.3% of bridges in County 001. The average bridge in Connecticut is 0 years old; this one is 70 years old.
Nearby Bridges
MUSKET RIDGE ROAD over BALL POND BROOK
Built 2010
SAWMILL ROAD #1 over BALL POND BROOK
Built 2019
ROUTE 39 over BALL POND BROOK
Built 1990
SMOKE HILL DRIVE over EAST LAKE BROOK
Built 2010
EAST LAKE STREET over EAST LAKE BROOK
Built 1984
U.S. ROUTE 7 over N MOUNTAIN RD & LIMEKILN
Built 2009
U.S. ROUTE 7 BYPAS over WETLAND A
Built 2009
U.S. ROUTE 7 over TRIBUTARY BROOK/ WETLAND
Built 2009
US ROUTE 202 over US ROUTE 7
Built 1976
US ROUTE 7 over REPTILE CROSSING
Built 2009
Bridge Details
- Structure #
- 05105
- Year Built
- 1956
- Length
- 10.4 m (34.1 ft)
- Max Span
- 9.4 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 948
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.