WEST GLEN DRIVE over MIANUS RIVER

250 WEST OF WESTOVER RD · County 001, Connecticut · Built 1964 · 2 Lanes · 610 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
05010
Year Built
1964
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
610
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$1,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.