GURLEYVILLE ROAD over FENTON RIVER

1.3 MI EAST OF ROUTE 195 · County 013, Connecticut · Built 1970 · 2 Lanes · 1,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
04730
Year Built
1970
Length
13.1 m (43 ft)
Max Span
12.8 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,550
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.