CHESTNUT HILL ROAD over HAMMONASSET RIVER
0.3 MI E. OF ROUTE 79 · County 009, Connecticut · Built 1935 · 2 Lanes · 841 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.327478, -72.611544
This bridge is in worse condition than 14.6% of bridges in County 009. The average bridge in Connecticut is 0 years old; this one is 91 years old.
Nearby Bridges
RIVER ROAD NO. 1 over CHATFIELD HOLLOW BROOK
Built 1960
GREEN HILL ROAD over HAMMONASSET RIVER
Built 1995
CONCORD DRIVE over BROOK
Built 1978
CONCORD DRIVE over BROOK
Built 1978
HEATHERWOOD DRIVE over BROOK
Built 2022
RANDI DRIVE over HUZZLE GUZZLE BROOK
Built 1986
BARTLETT DRIVE over BROOK
Built 2010
ROUTE 80 over HAMMONASSET RIVER
Built 1934
WARPAS ROAD over NECK RIVER
Built 1987
GREEN HILL ROAD over NECK RIVER
Built 1983
Bridge Details
- Structure #
- 04713
- Year Built
- 1935
- Reconstructed
- 2000
- Length
- 12.5 m (41 ft)
- Max Span
- 11.3 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 841
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.