BURNHAM STREET over MATTABESSET RIVER

575 FT W. OF R0UTE 372 · County 003, Connecticut · Built 2019 · 2 Lanes · 5,151 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
04473
Year Built
2019
Length
14.7 m (48.2 ft)
Max Span
3.4 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
5,151
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$1,955,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.