ROUTE 25 NB over WHITNEY AVENUE

1.0 MI S OF ROUTE 111 · County 001, Connecticut · Built 1980 · 3 Lanes · 18,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
04328
Year Built
1980
Length
40.8 m (133.9 ft)
Max Span
39.6 m
Width
18.5 m (60.7 ft)
Lanes
3
Daily Traffic
18,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.