ROUTE 72 over PEQUABUCK RIVER

0.1 MILE E OF EXPWY END · County 003, Connecticut · Built 1980 · 4 Lanes · 28,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
04312
Year Built
1980
Length
75.4 m (247.4 ft)
Max Span
37.5 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
28,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.