INTERSTATE-84 WB over ROUTE 31

AT EXIT 67 · County 013, Connecticut · Built 1978 · 3 Lanes · 33,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04276
Year Built
1978
Length
49.1 m (161.1 ft)
Max Span
47.2 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
33,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.