B&M RR & HIGH ST over ROUTE 72

RTE 72 BETWEEN I84 &RTE 9 · County 003, Connecticut · Built 1976 · 3 Lanes · 6,800 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
04247
Year Built
1976
Length
52.1 m (170.9 ft)
Max Span
25.3 m
Width
176.3 m (578.4 ft)
Lanes
3
Daily Traffic
6,800
Material
Prestressed Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.