HOLABIRD AVENUE over STILL RIVER

250 FT EAST OF ROUTE 8 · County 005, Connecticut · Built 2018 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
04060
Year Built
2018
Length
28.4 m (93.2 ft)
Max Span
27.1 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
1,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.