PROSPECT STREET over FARMINGTON CANAL GREENWA

AT JCT WITH TRUMBULL ST · County 009, Connecticut · Built 1929 · 2 Lanes · 4,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03997
Year Built
1929
Reconstructed
2009
Length
14 m (45.9 ft)
Max Span
12.8 m
Width
18.4 m (60.4 ft)
Lanes
2
Daily Traffic
4,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.